Project Presentation
 
当前位置
The wastewater treatment project of Hill Shizhi District of Ziyang locomotive Factory of China Nanche Group
It was built in 2004, and occupies an area of 450 square meters. The construction period lasts for three months. The whole set of facilities is buried underground with its surface land recovered as Croquet Field, which is harmonious with the environment of the neighborhood. With no odor or noise pollution, the system will directly discharge the processed water. Time of being put into service: September, 2004 Since its service entry the processment system has been producing and operating normally for ten years with a stable operation status, a low operational fee and no evolving sludge or clogging phenomenon.
Technics Adopted: PASG Technique
Processing Capability:500 tons/day
Processing Standard and its effects:GB18918-2002 attained by Class A, Grade One
Environmental Inspection institution:Protection Bureau of Ziyang City



脚注信息
Copyright ©2011-2014 PASG Technology Team Sichuan Province ICP For the record 11020001